A painting bid has four parts: paint and supplies, labor, the job's share of overhead, and profit. Most bad bids get one of them wrong, usually labor, because prep takes longer than anyone wants to admit.
Here's how to build a bid you can stand behind.
Step 1: Measure, don't guess
Walk the job with a tape and write down the square footage of every surface you'll paint: walls, ceilings, trim (in linear feet), doors (by count). Note the condition: patching, caulking, stains to block, wallpaper to strip.
Step 2: Work out the paint
Every paint can lists a coverage rate on the label, in square feet per gallon. Use the label of the product you'll actually buy.
Gallons = square feet to paint x number of coats / coverage per gallon. Round up, and add primer if the surface needs it.
Example
A bedroom with 400 square feet of wall, two coats, paint that covers 350 square feet per gallon:
400 x 2 / 350 = 2.29, so 3 gallons. At $50 a gallon (example price), that's $150. Add tape, plastic, rollers and caulk: say $40. Materials: $190.
Step 3: Work out the labor from your own production rate
Your production rate is how many square feet an hour you (or your crew) actually paint, including cutting in. Time yourself on a few rooms. Then add prep and cleanup as separate hours, because they don't scale with square footage.
Example, continued
If you paint 150 square feet an hour per coat: 400 x 2 / 150 = 5.3 hours of painting. Add 3 hours of prep (moving furniture, patching, taping) and 1 hour of cleanup: about 9.3 hours.
At a labor cost of $45 an hour (what an hour costs you, with payroll taxes, not the wage): 9.3 x $45 = $418.50.
Step 4: Add overhead
Overhead is what the business costs outside of jobs: vehicle, insurance, ladders and sprayers, software, marketing. A simple way to charge it to each job: last year's overhead divided by last year's materials plus labor gives you a percentage.
At 20% overhead (example): ($190 + $418.50) x 0.20 = $121.70.
Step 5: Price to your margin
Cost of the job: $190 + $418.50 + $121.70 = $730.20.
For a 30% margin: $730.20 / (1 - 0.30) = $1,043.14. Round to $1,045.
Don't add 30% to cost instead. $730.20 x 1.30 = $949.26, which is only a 23% margin. The job pricing calculator shows the price, margin and markup together.
Step 6: Write the bid so it survives a comparison
Customers compare bids, and the cheapest one often leaves out prep. Spell yours out:
- Surfaces, number of coats and the product you'll use
- Prep included (patching, caulking, priming)
- What's not included (moving heavy furniture, wallpaper removal)
- How long it will take and when you can start
A detailed bid at $1,045 beats a one-line bid at $850 more often than you'd think, because the customer can see what they're paying for.
After the job, check the bid
Write down the real hours and the real paint used. If prep took 5 hours instead of 3, your next bid should know that.
Is your pricing leaking money? Free 60-second check, five questions. Answers stay in your browser.
FAQ
How do I bid exterior painting? Same steps, with more prep (scraping, washing, repairs), ladder or lift time, and weather days. Your production rate outside is usually slower than inside, so time it separately.
Should I bid by the square foot or by the hour? Estimate with square feet and your production rate, then quote the whole job as one price. The customer gets a fixed number and you get paid for working efficiently.
How do I avoid underbidding? Track real hours on every job and update your production rate. Most underbids come from prep and cleanup that weren't counted.
Should I charge for estimates? Many painters give free estimates on standard jobs and charge for detailed bids on large or commercial work. Decide based on how many of your estimates turn into jobs.
Bid it in a minute: the free job pricing calculator turns paint, labor and overhead into a price at your margin. No sign-up.