A good bid wins the job and still pays. Most bad bids fail the same way: the labor was guessed, the overhead was forgotten, or the profit was added the wrong way. Here's a process that works for any trade.
Step 1: Walk the job
See it in person or from good photos. Measure, note access, look for anything that will slow you down, and ask what the customer expects to be done when you leave. Most overruns start with something nobody looked at.
Step 2: List the materials
Everything the job uses up, with delivery, disposal and rentals for this job only. Add a little for waste. Tools and equipment you own aren't materials; they're overhead.
Step 3: Estimate labor hours from your own jobs
Use the real hours from past jobs like this one, including the drive, setup, cleanup and any return trip. If you don't track hours yet, start now; it's the number that makes or breaks every bid. Price those hours at what an hour of labor costs you, with payroll taxes and insurance, not the wage. The guide to labor cost per hour shows how.
Step 4: Add the job's share of overhead
Overhead is the truck, insurance, office, phone, software and marketing you pay no matter what. A simple method: last year's overhead divided by last year's materials plus labor gives you a percentage to add to every job. See how to calculate business overhead.
Step 5: Price to a margin, not a markup
Divide the total cost by one minus the margin you want to keep. Adding your target percentage to cost leaves you less than you planned:
Example numbers, from the guide to bidding a painting job: the job costs $730.20 with overhead.
- Cost plus 30%: $730.20 x 1.30 = $949.26, a 23.1% margin
- Priced to a 30% margin: $730.20 / 0.70 = $1,043.14
Same job, $93.88 difference. The markup vs margin guide has a conversion table.
Is your pricing leaking money? Free 60-second check, five questions. Answers stay in your browser.
Step 6: Write down what's included
List the scope, what's not included, the materials or brands, how changes are priced, and when the price expires. A clear bid wins more often than a cheap one, and it turns surprises into change orders instead of free work.
Step 7: Follow up
Send the bid quickly, then follow up the same day, a few days later and a week later. See how to follow up on an estimate.
Fixed price or time and materials?
For work you can estimate well, bid a fixed price. For work with real unknowns, such as repairs behind walls, consider time and materials or a not-to-exceed cap. The guide to time and materials vs fixed price compares them with a worked example.
Bidding guides by trade
- How to bid a painting job
- How to price handyman jobs
- How to price landscaping jobs
- How to price cleaning jobs
- How to price tree removal jobs
FAQ
What is the best way to bid a job? Build it from your costs: materials, labor hours at your real labor cost, and overhead, then divide by one minus your target margin, and write down exactly what's included.
How do I estimate labor on a bid? Use the actual hours from your past jobs of the same kind, including travel, setup, cleanup and return trips. Track every job so the next bid is more accurate.
Should I add a contingency? For work with known unknowns, yes. Add a buffer to the hours or a line for the risk, and say what happens if it isn't needed or isn't enough.
What if my bid is higher than other bids? Check your hours and overhead first. If they're right, a lower bid means losing money. Win on a clear scope, reliability and follow-up.
Run your numbers: the free job pricing calculator builds a bid from your own costs and margin. No sign-up.