Deck staining is mostly labor. The stain is a small part of the bill; washing, drying time, prep and getting stain into every board, rail and stair are where the hours go.
The formula
- Measure the deck surface, and count rails, stairs and spindles separately: they take far longer per square foot than the floor.
- Stain and supplies: stain (check the coverage on the can), brushes, pads, tape, cleaner or brightener.
- Labor hours: washing or stripping, drying, sanding loose fibers, staining and cleanup, including a return trip if the deck needs to dry first.
- Add overhead, price to your margin, and divide by the square feet.
Worked examples
These are example numbers. Use your own speed and costs.
- Labor cost: $30 an hour, overhead 25%, margin 30%
- Stain covers about 150 square feet a gallon, one coat, $45 a gallon
300 square foot deck: 2 gallons ($90) plus $35 of supplies = $125. 9 labor hours (3 washing and prep, 5 staining, 1 cleanup). Labor $270. Labor plus materials $395. Overhead $98.75. Total cost $493.75. Price: $493.75 / 0.70 = $705.36, about $2.35 a square foot.
500 square foot deck: 4 gallons ($180) plus $20 more of supplies = $200. 14 labor hours (4 washing and prep, 8.5 staining, 1.5 cleanup). Labor $420. Labor plus materials $620. Overhead $155. Total cost $775. Price: $775 / 0.70 = $1,107.14, about $2.21 a square foot.
The bigger deck costs less per square foot because setup and cleanup are spread over more boards. The painting estimate calculator prices any staining job from your own numbers.
Is your pricing leaking money? Free 60-second check, five questions. Answers stay in your browser.
What changes the price
- Rails, stairs and spindles: slow work. Price them by the hour or as an add-on.
- Old finish: stripping a failing solid stain takes far longer than washing a weathered deck.
- Stain type: solid stains often need two coats; semi-transparent usually one.
- Repairs: loose boards and popped nails are extra; price them by the time and parts.
Weather and drying time
A deck usually needs to dry after washing before it's stained, which can mean two visits. Count both trips in your hours. Rain delays don't cost the customer more, so leave room in your schedule rather than in a lower margin.
Related pricing guides
Pricing a similar job? See How Much to Charge for Painting Per Square Foot and How Much to Charge for Pressure Washing Per Square Foot, or run your own numbers in the painting estimate calculator.
Check the rest of your pricing
The free 60-second Profit Leak Check shows whether your hourly rate covers your pay, overhead and profit, and whether your markup keeps what you think.
Meet other owners
Painters, pressure washers and deck builders send each other work. Growvio is a free group where home-service owners swap referrals and what's working. Join free, it takes about a minute.
FAQ
How much should I charge to stain a deck? Build the job from stain, supplies, labor and overhead at your margin. In the example, a 300 square foot deck comes to $705.36.
Should I price deck staining per square foot? It's a fine way to quote, but build the rate from a real job. In the example, it works out to about $2.35 a square foot on 300 square feet and $2.21 on 500.
Do rails and stairs cost extra? Usually. They take much longer per square foot than the floor, so price them separately.
Should washing be included? Yes, or offered as a combined wash-and-stain price. Staining over a dirty deck won't last.
Run your numbers: the free painting estimate calculator prices any staining job from your own costs. No sign-up.