Tile is quoted per square foot, but the cost isn't spread evenly. Prep, layout, cuts and cleanup take time on every job, so small jobs cost much more per square foot than big ones.
The formula
- Measure the area and add about 10% for cuts and waste.
- Materials: tile, thinset, grout, backer board or membrane, spacers and sealer.
- Labor hours: prep, layout, setting, cuts, grouting, sealing and cleanup, including every trip back while thinset and grout cure.
- Add overhead, price to your margin, and divide by the square feet.
Worked examples
These are example numbers. Use your own speed and costs.
- Labor cost: $35 an hour, overhead 25%, margin 30%
Small bathroom floor, 50 square feet: 55 square feet of tile at $3 ($165) plus $93 of setting materials, backer and sealer = $258. 12 labor hours (3 prep, 6 setting, 2 grout, 1 cleanup). Labor $420. Labor plus materials $678. Overhead $169.50. Total cost $847.50. Price: $847.50 / 0.70 = $1,210.71, about $24.21 a square foot.
Large floor, 200 square feet: 220 square feet of tile at $3 ($660) plus $200 of setting materials = $860. 27 labor hours (5 prep, 16 setting, 4 grout, 2 cleanup). Labor $945. Labor plus materials $1,805. Overhead $451.25. Total cost $2,256.25. Price: $2,256.25 / 0.70 = $3,223.21, about $16.12 a square foot.
Kitchen backsplash, 30 square feet: 33 square feet of tile at $8 ($264) plus $50 of setting materials = $314. 8 labor hours (lots of cuts around outlets and edges). Labor $280. Labor plus materials $594. Overhead $148.50. Total cost $742.50. Price: $742.50 / 0.70 = $1,060.71, about $35.36 a square foot.
The job pricing calculator prices any tile job from your own numbers.
Is your pricing leaking money? Free 60-second check, five questions. Answers stay in your browser.
What changes the rate
- Tile size and pattern: small mosaics, large-format tile and herringbone all take longer than standard sizes on a straight lay.
- Prep: removing old tile, leveling a floor or adding a membrane can take as long as setting.
- Cuts: backsplashes and bathrooms have many more cuts per square foot than open floors.
- Who supplies the tile: if the customer buys the tile, price labor and setting materials only, and say so in the quote.
Set a minimum
Small repairs and tiny areas still take the drive, mixing and cure time. Price them as a minimum per job, not per square foot. For full bids, see the best way to bid a job.
Related pricing guides
Pricing a similar job? See How Much to Charge for Baseboard Installation, How Much to Charge for Drywall Per Square Foot and How Much to Charge for Backsplash Installation, or run your own numbers in the job pricing calculator.
Check the rest of your pricing
The free 60-second Profit Leak Check shows whether your hourly rate covers your pay, overhead and profit, and whether your markup keeps what you think.
Meet other owners
Tile setters, remodelers and plumbers send each other work. Growvio is a free group where home-service owners swap referrals and what's working. Join free, it takes about a minute.
FAQ
How much should I charge per square foot for tile installation? Build the job from tile, materials, labor and overhead at your margin, then divide by the area. In the example, a 200 square foot floor comes to about $16.12 a square foot.
Why do small jobs cost more per square foot? Prep, layout, mixing and cleanup take time on every job. On a small job, that time is spread over fewer square feet.
Are backsplashes priced higher? Usually. They have many more cuts per square foot. In the example, a 30 square foot backsplash comes to about $35.36 a square foot.
Should waste be included? Yes. Add about 10% for cuts, more for diagonal or herringbone layouts.
Run your numbers: the free job pricing calculator prices any tile job from your own costs. No sign-up.