The Playbook
PricingPricing guide for every trade →

How Much to Charge for Deck Building

Short answer

Price deck building from the crew time to dig footings, frame, deck, rail and build stairs, plus materials and your overhead, then divide by one minus your margin. In our example a 12 by 16 foot pressure-treated deck prices at $9,488.00, about $49.42 a square foot, and the same deck in composite at $15,536.00, about $80.92 a square foot.

Get every pricing calculator for your trade, free. Plus a group of owners who compare prices and swap referrals. Free to join, no card.

Or take the free 60-second pricing check

By the Growvio team 2 min read

In this article
  1. The formula
  2. Worked examples
  3. What changes the price
  4. Take a deposit
  5. Related pricing guides
  6. Check the rest of your pricing
  7. Meet other owners
  8. FAQ

Decks are big projects with big material bills, and the framing is where time gets lost. Price your crew hours honestly, take a deposit, and quote by the job with a per-square-foot number to compare.

The formula

  1. Design and measure: size, height, stairs, railing and the permit.
  2. Crew time: footings, framing, decking, railing and stairs, counted for every person.
  3. Materials: lumber or composite, joist hangers, fasteners, concrete and railing.
  4. Add overhead for your truck, tools, insurance and admin, and price to your margin.

Worked examples

These are example numbers. Use your own.

  • Labor cost: $28 an hour per person
  • Overhead: 30%
  • Margin: 35%

12 by 16 foot pressure-treated deck, 192 sq ft: 48 crew-hours, $3,400 of materials. Labor $1,344. Labor plus materials $4,744. Overhead $1,423.20. Total cost $6,167.20. Price: $6,167.20 / 0.65 = $9,488.00, about $49.42 a square foot.

12 by 16 foot composite deck, 192 sq ft: 56 crew-hours, $6,200 of materials. Labor $1,568. Labor plus materials $7,768. Overhead $2,330.40. Total cost $10,098.40. Price: $10,098.40 / 0.65 = $15,536.00, about $80.92 a square foot.

The handyman pricing calculator prices any job from your own numbers.

Is your pricing leaking money? Free 60-second check, five questions. Answers stay in your browser.

Question 1 of 5

Or your average take per hour on jobs.

$/hr

What changes the price

  • Height: raised decks need taller posts, bracing and more stairs.
  • Material: composite and hardwood cost far more than pressure-treated.
  • Railing: cable or aluminum railing is a big line on its own.
  • Old deck removal: tearing out an old deck is its own line.

Take a deposit

Deck materials are expensive. Take a deposit at signing so you are not carrying the cost.

Pricing a similar job? See How Much to Charge for Deck Repair and How Much to Charge for Deck Staining, or run your own numbers in the handyman pricing calculator.

Check the rest of your pricing

The free 60-second Profit Leak Check shows whether your hourly rate covers your pay, overhead and profit, and whether your markup keeps what you think.

Meet other owners

Deck, fence and landscaping companies send each other work. Growvio is a free group where home-service owners swap referrals and what's working. Join free, it takes about a minute.

FAQ

How much should I charge to build a deck? Build it from crew time, materials and overhead at your margin. In the example a 12 by 16 foot pressure-treated deck comes to $9,488.00.

How much per square foot? In the example about $49.42 for pressure-treated and about $80.92 for composite.

Should the permit be in the price? Yes, include it so the customer sees one number.

Should I take a deposit? Yes, it covers materials before you start.

Run your numbers: the free handyman pricing calculator prices any job from your own costs. No sign-up.

Every pricing calculator and guide for your trade, free.

Hourly rate, job pricing, markup and hiring calculators for the trades, plus a free group of owners who run the same kind of business. Free to join, no card.

Free to join. No credit card.

Keep reading