Equipment is the biggest line on an AC install, so it's tempting to quote equipment plus a labor number. That leaves out the warranty callbacks, permits, trucks and office time your margin has to cover. Price the whole job to your margin.
The formula
- Equipment: condenser, coil or air handler, at what you actually pay.
- Materials: line set, pad, disconnect, whip, refrigerant, drain parts and thermostat.
- Tech-hours: recovery and removal, setting, brazing, pressure test, vacuum, electrical and startup, for everyone on the job.
- Add overhead for trucks, tools, permits, insurance and dispatch, and price to your margin.
Worked examples
These are example numbers. Use your own.
- Labor cost: $35 an hour
- Overhead: 30%
- Margin: 35%
3-ton AC and matching coil, same location: $3,600 in equipment and materials, 2 techs for a day (16 tech-hours). Labor $560. Labor plus materials $4,160. Overhead $1,248. Total cost $5,408. Price: $5,408 / 0.65 = $8,320.00.
Full heat pump system, outdoor unit and air handler: $5,200 in equipment and materials, 24 tech-hours. Labor $840. Labor plus materials $6,040. Overhead $1,812. Total cost $7,852. Price: $7,852 / 0.65 = $12,080.00.
The heat pump costs more for both the equipment and the extra day of labor. The HVAC labor rate calculator sets the hourly cost these jobs are built on.
Is your pricing leaking money? Free 60-second check, five questions. Answers stay in your browser.
What changes the price
- Line set: reusing it is faster. A new or longer line set is more material and more hours.
- Access: attics, crawl spaces and rooftop units slow the job and may need extra hands.
- Electrical: a new disconnect, a bigger breaker or a new circuit adds time and parts.
- Ductwork: sizing problems or a new plenum are separate work. Quote them on their own line.
- Permits and rebates: include the permit fee and the time to file rebate paperwork if you handle it.
Give good, better, best
Quote two or three equipment options on the same estimate, each priced to your margin. Customers like choosing, and many pick the middle one.
Related pricing guides
Pricing a similar job? See HVAC Labor Rates Per Hour and How Much to Charge for Water Heater Installation, or set your rate in the HVAC labor rate calculator.
Check the rest of your pricing
The free 60-second Profit Leak Check shows whether your hourly rate covers your pay, overhead and profit, and whether your markup keeps what you think.
Meet other owners
HVAC companies, plumbers and electricians send each other work. Growvio is a free group where home-service owners swap referrals and what's working. Join free, it takes about a minute.
FAQ
How much should I charge to install central air? Build it from equipment, materials, tech-hours and overhead at your margin. In the example a 3-ton AC and coil replacement comes to $8,320.00.
How much should I charge for a heat pump install? More equipment and more hours. In the example a full heat pump system comes to $12,080.00.
Should I mark up equipment? Price the whole job to your margin, equipment included. The margin pays for warranty callbacks, the office and the risk.
Should I include ductwork changes? Quote them as a separate line so the customer can see and approve them.
Set your rate: the free HVAC labor rate calculator works out what an hour has to bill. No sign-up.